Industrial & production sector
We lead industrial development through integrated, innovative solutions that meet local and global market needs

Investment areas
Building factories with the latest technology
Designing and building modern factories to the highest standards of quality and technological efficiency
Operating factories with the latest management methods
Applying the latest management and operation methods to ensure maximum efficiency
Import, export & commercial agencies
Comprehensive import, export and commercial-agency management services
Carbon footprint
Applying environmental sustainability standards and reducing the carbon footprint
Production control
Advanced control systems to ensure production quality and global standards
Workforce qualification & training
Specialized training programs to qualify industrial cadres and develop their skills
Project register
Building the marble & granite industrial complex in Al-Gifgafa, Central Sinai
The complex spans 2 million m², including a giant compound with a 30,000 m² manufacturing hangar and a storage area for finished products, an integrated administrative system for the workforce, and 150 acres of olive trees planted on unused land — at a cost of EGP 804.56 million.
Building the SME industrial complex in Al-Baghdadi, Luxor governorate
Built on 49.17 acres with 206 industrial units (432 m² – 384 m²), at a cost of EGP 817 million, hosting diverse activities: food, engineering and chemical industries, furnishings, ready-made clothing and decorative building materials.
Building the SME industrial complex in Bayad Al-Arab, Beni Suef governorate
Built on 70 acres with 266 industrial units, at a cost of EGP 901 million, with unit sizes ranging (432 m² – 540 m² – 648 m²), hosting chemical, light-metal, engineering and food industries.
Building the upgraded Fayoum cotton gin
Built on 10 acres at a cost of EGP 300 million, with a capacity of 5 tons of lint cotton/hour — 120 tons/day, equal to 2,400 qintars/day.
Building the archaeological replicas factory in Obour City
An ambitious, successful project built over about a year and a half to meet local and global demand for archaeological replicas, produced at the highest artistic level by experienced Egyptian artists and specialists.
Opening dairy production complex No. 1 in Nubaria, Beheira governorate
The complex runs on 2,000 dairy cattle under high health standards using world-class breeding and production technology, blending global and local breeds. It includes an advanced automated milking parlor, a feed-mixing unit, a veterinary clinic and lab, a fuel station and fire-fighting rooms.
Building the seawater desalination plant in Arish
A seawater desalination plant with 10,000 m³/day capacity in Arish, comprising a 660 m sea intake (45,000 m³/day), two 710 mm pipelines, a sump building, 9 water-lifting sets (630 m³/h), 10 sand filters (4.3 m diameter), and a desalination building with 7 units (1,450 m³/day).
Building the wastewater treatment plant in El-Tor
As part of the state's plan to expand Sinai's sewage network, a wastewater treatment plant was built in El-Tor with 10,000 m³/day capacity.
Building the dyeing & printing factories in Robbiki Industrial City
The dyeing factory (26,244 m²) has 18 machines producing 40,000 tons/day of woven fabric and 10 tons/day of circular knit; the printing factory (5,000 m²) has 3 machines producing 20,000 m/day — designed with the latest water-conservation and chemical-efficiency technology using German, Swiss and Italian equipment.
Building the woven-textile factory in Robbiki Industrial City
Built on 11,236 m² to produce 180 cm-wide woven fabric, with 100 Italian weaving machines and a capacity of 30,000 linear meters/day, fully equipped with operational-safety technology and quality-control systems.
Building the circular-knit factory in Robbiki Industrial City
Built on 6,000 m² with 35 varied Italian machines and 51 round-the-clock workers, producing 10 tons/day of all types of circular-knit fabric used in ready-made clothing.
Building cheese-production factories in Sohag and Assiut
Producing cheese in (80–250 g) packs sold at lower prices, in Arab Al-Awamer (Assiut) and Al-Kawthar (Sohag), at a cost of EGP 135 million and a capacity of 7,200 tons/year.
Building the heat-treatment factory
A heat-treatment factory covering all types of heat-treatment processes.
Building the solar-panel factory at Banha Electronic Industries
Developing a solar-panel factory at Banha Electronic Industries with 50 MW/year capacity, to secure the supply of panel components for building solar power fields.
Building the battery factory at Qaha Chemical Industries
Building a battery factory at Qaha Chemical Industries (Factory 270) over 4,000 m² with a capacity of 120,000 batteries/year, at a cost of EGP 124.7 million.
Building the mazut hydrocracking complex at ERC in Mostorod
A mazut hydrocracking complex converting it into high-quality distillates, at a cost of USD 4.3 billion, producing ~2.3M tons/year diesel, 599K tons jet fuel, 315K tons mazut, 336K tons light naphtha, 96K tons sulfur and 453K tons coke annually — reducing imports and maximizing local production.
Building the surface-treatment factory
Building 16 coating lines of various types, equipped with a wastewater-treatment unit for environmental protection.
Building the hot-galvanizing factory at Helwan Machinery & Equipment
A hot-galvanizing factory at Helwan Machinery & Equipment (Military Factory 999), over 25,200 m², with a capacity of 15,000–20,000 tons.
Building Damietta Furniture City
A major national project and launchpad for SMEs — the gateway for Damietta furniture to reach global markets. The first and largest industrial zone specialized in furniture and complementary industries in the Middle East, transforming furniture-making from a craft into a technology-driven industry with strong export potential.
Building rolling mill No. 3 in Suez
The mill includes a billet-heating furnace, a billet-welding machine, 14 rolling stands, high-speed rolling, a cooling bed, product-transfer units, water and power stations, an administrative building and a lab — among the most advanced rolling systems with top-tier eco-friendly industrial safety.
Building the gas-factories complex in Abu Rawash, Giza
Building medical & industrial gas factory No. 3 and a hydrogen-peroxide (50%) factory at El-Nasr Intermediate Chemicals in Abu Rawash — covering local demand for medical oxygen for hospitals and supporting many industrial uses in petroleum, paper, textiles, food and pharmaceuticals, executed with several civil companies.
Building the telecom-networks quality-measurement center at the NTRA
Building a telecom-networks quality-measurement center at the National Telecom Regulatory Authority to ensure service quality for citizens.
Building the phosphate & compound fertilizer complex in Ain Sokhna
Building 2 steam turbines (46 MW) at the phosphate & compound fertilizer complex in Ain Sokhna, covering 75% of required electricity, with the remaining 25% from the national grid.
Increasing capacity of Arish Cement Factory
Upgrading Arish Cement Factory to a 7-million-tons/year capacity with 4 production lines.
Want to be our next partner?
Join our successful clients and invest with us in secure projects
Contact us