Investment areas

Building factories with the latest technology

Designing and building modern factories to the highest standards of quality and technological efficiency

Operating factories with the latest management methods

Applying the latest management and operation methods to ensure maximum efficiency

Import, export & commercial agencies

Comprehensive import, export and commercial-agency management services

Carbon footprint

Applying environmental sustainability standards and reducing the carbon footprint

Production control

Advanced control systems to ensure production quality and global standards

Workforce qualification & training

Specialized training programs to qualify industrial cadres and develop their skills

+24
projects on record
4
time periods
146
branches worldwide

Project register

2022 1 projects

Building the marble & granite industrial complex in Al-Gifgafa, Central Sinai

أكتوبر 2022

The complex spans 2 million m², including a giant compound with a 30,000 m² manufacturing hangar and a storage area for finished products, an integrated administrative system for the workforce, and 150 acres of olive trees planted on unused land — at a cost of EGP 804.56 million.

EGP 804.56M
2021 5 projects

Building the SME industrial complex in Al-Baghdadi, Luxor governorate

ديسمبر 2021

Built on 49.17 acres with 206 industrial units (432 m² – 384 m²), at a cost of EGP 817 million, hosting diverse activities: food, engineering and chemical industries, furnishings, ready-made clothing and decorative building materials.

EGP 817M

Building the SME industrial complex in Bayad Al-Arab, Beni Suef governorate

ديسمبر 2021

Built on 70 acres with 266 industrial units, at a cost of EGP 901 million, with unit sizes ranging (432 m² – 540 m² – 648 m²), hosting chemical, light-metal, engineering and food industries.

EGP 901M

Building the upgraded Fayoum cotton gin

ديسمبر 2021

Built on 10 acres at a cost of EGP 300 million, with a capacity of 5 tons of lint cotton/hour — 120 tons/day, equal to 2,400 qintars/day.

EGP 300M

Building the archaeological replicas factory in Obour City

مارس 2021

An ambitious, successful project built over about a year and a half to meet local and global demand for archaeological replicas, produced at the highest artistic level by experienced Egyptian artists and specialists.

Opening dairy production complex No. 1 in Nubaria, Beheira governorate

يناير 2021

The complex runs on 2,000 dairy cattle under high health standards using world-class breeding and production technology, blending global and local breeds. It includes an advanced automated milking parlor, a feed-mixing unit, a veterinary clinic and lab, a fuel station and fire-fighting rooms.

2,000 cattle
2020 7 projects

Building the seawater desalination plant in Arish

أكتوبر 2020

A seawater desalination plant with 10,000 m³/day capacity in Arish, comprising a 660 m sea intake (45,000 m³/day), two 710 mm pipelines, a sump building, 9 water-lifting sets (630 m³/h), 10 sand filters (4.3 m diameter), and a desalination building with 7 units (1,450 m³/day).

10,000 m³/day

Building the wastewater treatment plant in El-Tor

أكتوبر 2020

As part of the state's plan to expand Sinai's sewage network, a wastewater treatment plant was built in El-Tor with 10,000 m³/day capacity.

10,000 m³/day

Building the dyeing & printing factories in Robbiki Industrial City

يوليو 2020

The dyeing factory (26,244 m²) has 18 machines producing 40,000 tons/day of woven fabric and 10 tons/day of circular knit; the printing factory (5,000 m²) has 3 machines producing 20,000 m/day — designed with the latest water-conservation and chemical-efficiency technology using German, Swiss and Italian equipment.

Building the woven-textile factory in Robbiki Industrial City

يوليو 2020

Built on 11,236 m² to produce 180 cm-wide woven fabric, with 100 Italian weaving machines and a capacity of 30,000 linear meters/day, fully equipped with operational-safety technology and quality-control systems.

Building the circular-knit factory in Robbiki Industrial City

يوليو 2020

Built on 6,000 m² with 35 varied Italian machines and 51 round-the-clock workers, producing 10 tons/day of all types of circular-knit fabric used in ready-made clothing.

Building cheese-production factories in Sohag and Assiut

مايو 2020

Producing cheese in (80–250 g) packs sold at lower prices, in Arab Al-Awamer (Assiut) and Al-Kawthar (Sohag), at a cost of EGP 135 million and a capacity of 7,200 tons/year.

EGP 135M

Building the heat-treatment factory

فبراير 2020

A heat-treatment factory covering all types of heat-treatment processes.

2019 11 projects

Building the solar-panel factory at Banha Electronic Industries

فبراير 2019

Developing a solar-panel factory at Banha Electronic Industries with 50 MW/year capacity, to secure the supply of panel components for building solar power fields.

50 MW/year

Building the battery factory at Qaha Chemical Industries

فبراير 2019

Building a battery factory at Qaha Chemical Industries (Factory 270) over 4,000 m² with a capacity of 120,000 batteries/year, at a cost of EGP 124.7 million.

EGP 124.7M

Building the mazut hydrocracking complex at ERC in Mostorod

فبراير 2019

A mazut hydrocracking complex converting it into high-quality distillates, at a cost of USD 4.3 billion, producing ~2.3M tons/year diesel, 599K tons jet fuel, 315K tons mazut, 336K tons light naphtha, 96K tons sulfur and 453K tons coke annually — reducing imports and maximizing local production.

USD 4.3B

Building the surface-treatment factory

فبراير 2019

Building 16 coating lines of various types, equipped with a wastewater-treatment unit for environmental protection.

Building the hot-galvanizing factory at Helwan Machinery & Equipment

فبراير 2019

A hot-galvanizing factory at Helwan Machinery & Equipment (Military Factory 999), over 25,200 m², with a capacity of 15,000–20,000 tons.

15K–20K tons

Building Damietta Furniture City

ديسمبر 2019

A major national project and launchpad for SMEs — the gateway for Damietta furniture to reach global markets. The first and largest industrial zone specialized in furniture and complementary industries in the Middle East, transforming furniture-making from a craft into a technology-driven industry with strong export potential.

Building rolling mill No. 3 in Suez

نوفمبر 2019

The mill includes a billet-heating furnace, a billet-welding machine, 14 rolling stands, high-speed rolling, a cooling bed, product-transfer units, water and power stations, an administrative building and a lab — among the most advanced rolling systems with top-tier eco-friendly industrial safety.

Building the gas-factories complex in Abu Rawash, Giza

أكتوبر 2019

Building medical & industrial gas factory No. 3 and a hydrogen-peroxide (50%) factory at El-Nasr Intermediate Chemicals in Abu Rawash — covering local demand for medical oxygen for hospitals and supporting many industrial uses in petroleum, paper, textiles, food and pharmaceuticals, executed with several civil companies.

Building the telecom-networks quality-measurement center at the NTRA

سبتمبر 2019

Building a telecom-networks quality-measurement center at the National Telecom Regulatory Authority to ensure service quality for citizens.

Building the phosphate & compound fertilizer complex in Ain Sokhna

أكتوبر 2019

Building 2 steam turbines (46 MW) at the phosphate & compound fertilizer complex in Ain Sokhna, covering 75% of required electricity, with the remaining 25% from the national grid.

46 MW

Increasing capacity of Arish Cement Factory

مايو 2019

Upgrading Arish Cement Factory to a 7-million-tons/year capacity with 4 production lines.

7M tons/year