Petroleum & mining
Comprehensive petroleum and mining services — First National Trust brings over 25 years of experience across the European and African unions
Our specialized services
Petroleum exploration
01Exploring and developing petroleum and natural-gas fields with the latest technologies
Mining & extraction
02Mining and extracting precious metals and natural ores
Refining & processing
03Petroleum refineries and processing of petroleum products
Marketing & distribution
04Distribution and marketing networks for petroleum and mineral products locally and globally
International investment
05International investment partnerships in petroleum and mining projects
Safety & environment
06Applying the highest safety and environmental standards in all operations
Investment areas
Exploration participation & investment
Participating in and investing in oil and natural-resource exploration
Technical & economic consulting
Providing technical and economic consulting for managing natural and economic resources
Petroleum & mining services
Comprehensive services in the petroleum and mining field
Project register
Building the Administrative Capital power plant
The first plant in Egypt to rely on air cooling.
Building the new Esna substation
The new Esna substation runs at 220×66 with 2×125 MVA, and 66/11 kV with 2×40 MVA.
Building Benban 3 substation
Expanding the station from (22/220) to (22/500), targeting 2,000 MW capacity, operating at 22/220/500 kV with 4×500 + 4×175 MVA.
Expanding the West Assiut power plant
Converting it to combined-cycle operation — raising efficiency and adding 500 MW without extra fuel; the project employed 2,300 workers (engineers, admins, supervisors, technicians).
Building the Kima 2 fertilizer factory in Aswan governorate
Building Kima 2 to produce ammonia and urea from natural gas instead of water electrolysis to conserve energy, using the world's latest urea and ammonia technology.
Building the Nag Hammadi regional control center
Building the Nag Hammadi control center (Upper Egypt electricity zone), controlling 111 substations at various voltages, serving Sohag, Qena, Luxor and Aswan.
Building the Samalut regional control center
Building the Samalut control center (Central Egypt electricity zone), controlling 91 substations at various voltages, serving Fayoum, Beni Suef, Minya, Assiut and New Valley.
Building the seawater desalination plant in Abu Zenima
Building a seawater desalination plant in Abu Zenima with 20,000 m³/day capacity.
Building Al-Salam pumping station
Building Al-Salam pumping station with 5.6 million m³/day capacity to lift water from the new course and pump it through 4 pipes.
Building Shader Azzam pumping station
Building Shader Azzam pumping station with 400,000 m³/day capacity to lift water from Shader Azzam drain to the new course.
Building the Egyptian refinery in Mostorod
Building a modern refining complex in Mostorod at a total cost of USD 4.336 billion, with foreign investment estimated at 87% of total project cost.
Building the Borg El-Arab grain silos complex
Building a 90,000-ton silo complex in New Borg El-Arab, Alexandria, over a total area of 22,800 m².
Building the photovoltaic plant in Kom Ombo
A 26 MW solar plant generating clean electricity.
Building the liquid-bulk station for ship supply
6 tanks (diesel/LPG) with 250,000 m³ capacity in Suez to increase strategic petroleum storage.
Building 4 silos in Sharqia governorate
270,000-ton silos in (Hehia, Abu Hammad, Borg El-Arab, El-Qassaseen East, San El-Hagar) to preserve the strategic wheat reserve.
Completing phase 9B of the West Delta fields
Developing the deep-water Mediterranean field, producing 365 million cubic feet of gas/day by drilling 8 wells.
Building Qantara East and Abu Suweir silos
90,000-ton silos in Ismailia to preserve the strategic wheat reserve.
Upgrading North Cairo power plant
Rehabilitating 2 gas turbines and raising unit efficiency, extending combustion-chamber overhaul intervals from 8,000 to 12,000 hours.
Converting Damietta 2 power plant to combined cycle
Developing the plant by adding a 250 MW combined steam unit to reach 750 MW.
Building Kiman Fares substation in Fayoum
A 22/66 kV substation in Fayoum governorate.
Developing the South Desouk fields in the Nile Delta
Raising production efficiency by 45 million cubic feet of gas/day and 400 barrels of condensate/day by drilling 4 wells.
Phase one of the El-Wasta / Beni Suef reinforcement line
A line feeding Beni Suef power plant, 65 km long and 36 inches in diameter.
Building El-Hammam silo in Matrouh governorate
A 45,000-ton silo to preserve the strategic wheat reserve.
Developing the gas fields in the Desouk area
Raising field efficiency to produce 130 million cubic feet of gas/day and 140 barrels of condensate/day.
Building the Southwest Meleiha oil pipeline
A pipeline transporting oil from the Southwest Meleiha fields in the Western Desert with 7,000 barrels/day capacity.
Building Barqash and Bani Salama silos
Two silos in Giza with 120,000-ton capacity to preserve the strategic wheat reserve.
Building a mobile power plant in Qoseir
An 11/66/220 kV substation, 40 MVA, to reinforce the electrical grid.
Building Al-Narges substation in Cairo
Reinforcing the unified grid by linking Al-Narges station to Sakaka El-Kuraimat station at 220 kV.
Building the phosphate & compound fertilizer complex
A complex in Ain Sokhna over 400 acres.
Building Bani Mazar East substation
Reinforcing the national grid to absorb added capacity and reduce losses.
Building South Helwan steam power plant
A new steam power plant to boost electricity generation.
Building 4 diesel & gasoline tanks in Suez
4 tanks (3 diesel, 1 gasoline) with a total capacity of 45,000 m³ to increase storage.
Building the El-Tina – Abu Sultan – Administrative Capital gas line
A 42-inch gas line, 165 km long, to reinforce the national grid and feed the Administrative Capital.
Building El-Maasara substation in Assiut
An 11/66 kV substation, 2×40 MVA, gas-insulated type.
Building Beni Suef Industrial substation
3 transformers of 750 MVA each to reinforce the 500 kV grid and feed the new industrial zone.
Sewage plants in Cairo governorate
Sewage projects with a total capacity of 760,000 m³/day to improve sewage services.
Establishing solar-powered wells
Establishing 75 groundwater wells in New Valley and Toshka using solar power.
Building Zahraa El-Maadi substation
A 22/220/500 kV substation, 3×500 MVA, linked to the Administrative Capital.
Building the Ebni Beitak substation in 6th of October City
Substations serving the Ebni Beitak areas, social housing and the Sakan Misr project.
Phase two of developing the North Alexandria and West Mediterranean fields
Developing deep-water natural-gas reserves totaling 8 wells producing 700 million cubic feet/day.
Building petroleum-product storage depots and a loading platform in Assiut
1,000 m³ storage capacity each, plus a loading platform, to serve Assiut residents.
Building Menouf silo in Menoufia governorate
60,000-ton capacity to preserve the strategic wheat reserve.
Building 3 silos in Minya governorate
Three silos (El-Sheikh Fadl, Bani Mazar, El-Bahnasa) with 180,000-ton capacity.
Converting the 6th of October gas power plant to combined cycle
Converting gas-generation units to combined cycle to raise total capacity to 940 MW without extra fuel.
Completing phase two of the Al-Amal gas field in the Gulf of Suez
Building a gas field producing 50 million cubic feet/day by drilling 4 wells and installing an offshore platform.
Building Abu El-Matamir substation in Beheira
Increasing the transmission-grid capacity nationwide for an efficient, reliable system.
Building the high-octane gasoline unit at ANRPC in Alexandria
Building the unit to produce 700,000 tons/year of high-octane gasoline and 10,000 tons/year of LPG.
Upgrading the Kalabsha central processing plant in the Western Desert
Raising efficiency to handle 120,000 barrels of water/day and increase extraction to 60,000 barrels of oil/day.
Operating 25 solar-powered wells in Dakhla (New Valley)
Establishing solar-powered wells with remote automation for 25 wells ~45 m deep, as a model for energy rationing.
Upgrading the Nooros gas field in the Nile Delta
Raising the Nooros field's efficiency to ~1.1 billion cubic feet of gas/day plus 8,600 barrels/day by drilling 15 wells.
Building West Maghagha substation in Minya
Built over 50,000 m² in El-Edwa district, north of Minya.
Building the Gabal El-Zeit wind power plant
Total capacity 580 MW across three phases of 240, 220 and 120 MW.
Building Benban 1 solar substation in Aswan
Building the largest solar power plant on Benban village land in Aswan — the world's largest — generating ~90% of the High Dam's output.
Upgrading the Shabab gas power plant in Ismailia
Raising capacity using the latest clean-energy technology and adding 500 MW.
Building Wadi El-Natrun substation in Beheira
Building transformers with 1,500 MW capacity.
Building Burullus combined-cycle power plant, north Kafr El-Sheikh
Building a power plant that is one of the world's largest combined-cycle plants.
Building Badr City substation, northeast Cairo
Total station capacity at 22/220/500 kV.
Building Beni Suef combined-cycle power plant
Building the East Ghayada power plant in Beni Suef, combined-cycle technology, 4,800 MW capacity.
Building the investment-clusters substation in 10th of Ramadan
An 11/66 kV substation, 2×40 MVA.
Building Gohaina substation in Sohag
Built at 66 kV with expansions to absorb added generation capacity and reduce grid losses, reinforcing Upper Egypt.
North Abu Qir 3 platform in the Mediterranean
Building a platform for new gas production of ~135 million cubic feet/day plus 3,300 barrels of oil and condensate/day by drilling 6 wells.
Upgrading the Gamil – Damietta gas line
Upgrading the line at 42 inches and 50 km, serving Damietta and Port Said.
Building Assiut East-Nile substation
Building the new Assiut East-Nile substation at 500/220/22 kV beside the industrial city to end power outages.
Building an organic-fertilizer factory at Mohamed Naguib Military Base in Matrouh
Building a factory over 20,000 m² to produce 10,000 m³ of plant compost per cycle.
Building the grain store in Qasr El-Basil, Fayoum governorate
Building the grain store in Qasr El-Basil, Fayoum, with 50,000-ton storage capacity to preserve wheat.
Building phases one and two of the Nubaria – Mit Nama gas line
Extending the gas line to feed North Giza power plant, in two phases: phase one 42-inch/34 km, phase two 32-inch/38 km.
Want to be our next partner?
Join our successful clients and invest with us in secure projects
Contact us