Our fields

Petroleum & mining

Comprehensive petroleum and mining services — First National Trust brings over 25 years of experience across the European and African unions

Petroleum & mining
+66
projects delivered
+25
years of experience

Our specialized services

Petroleum exploration

01

Exploring and developing petroleum and natural-gas fields with the latest technologies

Mining & extraction

02

Mining and extracting precious metals and natural ores

Refining & processing

03

Petroleum refineries and processing of petroleum products

Marketing & distribution

04

Distribution and marketing networks for petroleum and mineral products locally and globally

International investment

05

International investment partnerships in petroleum and mining projects

Safety & environment

06

Applying the highest safety and environmental standards in all operations

Investment areas

Exploration participation & investment

Participating in and investing in oil and natural-resource exploration

Technical & economic consulting

Providing technical and economic consulting for managing natural and economic resources

Petroleum & mining services

Comprehensive services in the petroleum and mining field

+66
projects on record
7
time periods
146
branches worldwide

Project register

2024 1 projects

Building the Administrative Capital power plant

يوليو 2024

The first plant in Egypt to rely on air cooling.

First in Egypt
2021 9 projects

Building the new Esna substation

ديسمبر 2021

The new Esna substation runs at 220×66 with 2×125 MVA, and 66/11 kV with 2×40 MVA.

Building Benban 3 substation

ديسمبر 2021

Expanding the station from (22/220) to (22/500), targeting 2,000 MW capacity, operating at 22/220/500 kV with 4×500 + 4×175 MVA.

2,000 MW

Expanding the West Assiut power plant

ديسمبر 2021

Converting it to combined-cycle operation — raising efficiency and adding 500 MW without extra fuel; the project employed 2,300 workers (engineers, admins, supervisors, technicians).

USD 441.8M

Building the Kima 2 fertilizer factory in Aswan governorate

ديسمبر 2021

Building Kima 2 to produce ammonia and urea from natural gas instead of water electrolysis to conserve energy, using the world's latest urea and ammonia technology.

Building the Nag Hammadi regional control center

ديسمبر 2021

Building the Nag Hammadi control center (Upper Egypt electricity zone), controlling 111 substations at various voltages, serving Sohag, Qena, Luxor and Aswan.

EGP 628M

Building the Samalut regional control center

ديسمبر 2021

Building the Samalut control center (Central Egypt electricity zone), controlling 91 substations at various voltages, serving Fayoum, Beni Suef, Minya, Assiut and New Valley.

EGP 684M

Building the seawater desalination plant in Abu Zenima

سبتمبر 2021

Building a seawater desalination plant in Abu Zenima with 20,000 m³/day capacity.

20,000 m³/day

Building Al-Salam pumping station

سبتمبر 2021

Building Al-Salam pumping station with 5.6 million m³/day capacity to lift water from the new course and pump it through 4 pipes.

5.6M m³/day

Building Shader Azzam pumping station

سبتمبر 2021

Building Shader Azzam pumping station with 400,000 m³/day capacity to lift water from Shader Azzam drain to the new course.

400K m³/day
2020 6 projects

Building the Egyptian refinery in Mostorod

سبتمبر 2020

Building a modern refining complex in Mostorod at a total cost of USD 4.336 billion, with foreign investment estimated at 87% of total project cost.

USD 4.336B

Building the Borg El-Arab grain silos complex

أغسطس 2020

Building a 90,000-ton silo complex in New Borg El-Arab, Alexandria, over a total area of 22,800 m².

EGP 120M + USD 7M

Building the photovoltaic plant in Kom Ombo

ديسمبر 2020

A 26 MW solar plant generating clean electricity.

EUR 19M

Building the liquid-bulk station for ship supply

نوفمبر 2020

6 tanks (diesel/LPG) with 250,000 m³ capacity in Suez to increase strategic petroleum storage.

USD 450M

Building 4 silos in Sharqia governorate

أكتوبر 2020

270,000-ton silos in (Hehia, Abu Hammad, Borg El-Arab, El-Qassaseen East, San El-Hagar) to preserve the strategic wheat reserve.

EGP 428.3M + USD 21.3M

Completing phase 9B of the West Delta fields

سبتمبر 2020

Developing the deep-water Mediterranean field, producing 365 million cubic feet of gas/day by drilling 8 wells.

USD 775M
2019 3 projects

Building Qantara East and Abu Suweir silos

ديسمبر 2019

90,000-ton silos in Ismailia to preserve the strategic wheat reserve.

EGP 174.6M + USD 7.8M

Upgrading North Cairo power plant

نوفمبر 2019

Rehabilitating 2 gas turbines and raising unit efficiency, extending combustion-chamber overhaul intervals from 8,000 to 12,000 hours.

EGP 294M

Converting Damietta 2 power plant to combined cycle

أكتوبر 2019

Developing the plant by adding a 250 MW combined steam unit to reach 750 MW.

USD 233.4M
2018 45 projects

Building Kiman Fares substation in Fayoum

نوفمبر 2018

A 22/66 kV substation in Fayoum governorate.

EGP 47.3M

Developing the South Desouk fields in the Nile Delta

نوفمبر 2018

Raising production efficiency by 45 million cubic feet of gas/day and 400 barrels of condensate/day by drilling 4 wells.

USD 49.3M

Phase one of the El-Wasta / Beni Suef reinforcement line

نوفمبر 2018

A line feeding Beni Suef power plant, 65 km long and 36 inches in diameter.

EGP 555M

Building El-Hammam silo in Matrouh governorate

نوفمبر 2018

A 45,000-ton silo to preserve the strategic wheat reserve.

EGP 101.6M + USD 4.2M

Developing the gas fields in the Desouk area

أكتوبر 2018

Raising field efficiency to produce 130 million cubic feet of gas/day and 140 barrels of condensate/day.

USD 275M

Building the Southwest Meleiha oil pipeline

أكتوبر 2018

A pipeline transporting oil from the Southwest Meleiha fields in the Western Desert with 7,000 barrels/day capacity.

USD 31M

Building Barqash and Bani Salama silos

سبتمبر 2018

Two silos in Giza with 120,000-ton capacity to preserve the strategic wheat reserve.

EGP 141.8M + USD 9.7M

Building a mobile power plant in Qoseir

سبتمبر 2018

An 11/66/220 kV substation, 40 MVA, to reinforce the electrical grid.

EGP 5M + USD 3M

Building Al-Narges substation in Cairo

سبتمبر 2018

Reinforcing the unified grid by linking Al-Narges station to Sakaka El-Kuraimat station at 220 kV.

EGP 223M

Building the phosphate & compound fertilizer complex

أغسطس 2018

A complex in Ain Sokhna over 400 acres.

EGP 15.688B

Building Bani Mazar East substation

أغسطس 2018

Reinforcing the national grid to absorb added capacity and reduce losses.

EGP 44.75M

Building South Helwan steam power plant

أغسطس 2018

A new steam power plant to boost electricity generation.

Building 4 diesel & gasoline tanks in Suez

يوليو 2018

4 tanks (3 diesel, 1 gasoline) with a total capacity of 45,000 m³ to increase storage.

EGP 70M

Building the El-Tina – Abu Sultan – Administrative Capital gas line

يوليو 2018

A 42-inch gas line, 165 km long, to reinforce the national grid and feed the Administrative Capital.

EGP 3.335B

Building El-Maasara substation in Assiut

يوليو 2018

An 11/66 kV substation, 2×40 MVA, gas-insulated type.

EGP 24.5M + USD 1.97M + EUR 0.12M

Building Beni Suef Industrial substation

يوليو 2018

3 transformers of 750 MVA each to reinforce the 500 kV grid and feed the new industrial zone.

Sewage plants in Cairo governorate

يونيو 2018

Sewage projects with a total capacity of 760,000 m³/day to improve sewage services.

EGP 3,103M

Establishing solar-powered wells

مايو 2018

Establishing 75 groundwater wells in New Valley and Toshka using solar power.

EGP 110M

Building Zahraa El-Maadi substation

مايو 2018

A 22/220/500 kV substation, 3×500 MVA, linked to the Administrative Capital.

EGP 157.82M + EUR 13.85M

Building the Ebni Beitak substation in 6th of October City

فبراير 2018

Substations serving the Ebni Beitak areas, social housing and the Sakan Misr project.

EGP 74M

Phase two of developing the North Alexandria and West Mediterranean fields

فبراير 2018

Developing deep-water natural-gas reserves totaling 8 wells producing 700 million cubic feet/day.

USD 1.8B

Building petroleum-product storage depots and a loading platform in Assiut

ديسمبر 2018

1,000 m³ storage capacity each, plus a loading platform, to serve Assiut residents.

EGP 70M

Building Menouf silo in Menoufia governorate

ديسمبر 2018

60,000-ton capacity to preserve the strategic wheat reserve.

EGP 60.4M + USD 4.7M

Building 3 silos in Minya governorate

نوفمبر 2018

Three silos (El-Sheikh Fadl, Bani Mazar, El-Bahnasa) with 180,000-ton capacity.

EGP 197.9M + USD 14M

Converting the 6th of October gas power plant to combined cycle

نوفمبر 2018

Converting gas-generation units to combined cycle to raise total capacity to 940 MW without extra fuel.

940 MW

Completing phase two of the Al-Amal gas field in the Gulf of Suez

أكتوبر 2018

Building a gas field producing 50 million cubic feet/day by drilling 4 wells and installing an offshore platform.

USD 84.5M

Building Abu El-Matamir substation in Beheira

أكتوبر 2018

Increasing the transmission-grid capacity nationwide for an efficient, reliable system.

Building the high-octane gasoline unit at ANRPC in Alexandria

سبتمبر 2018

Building the unit to produce 700,000 tons/year of high-octane gasoline and 10,000 tons/year of LPG.

USD 219M

Upgrading the Kalabsha central processing plant in the Western Desert

أغسطس 2018

Raising efficiency to handle 120,000 barrels of water/day and increase extraction to 60,000 barrels of oil/day.

USD 12M

Operating 25 solar-powered wells in Dakhla (New Valley)

أغسطس 2018

Establishing solar-powered wells with remote automation for 25 wells ~45 m deep, as a model for energy rationing.

Upgrading the Nooros gas field in the Nile Delta

يوليو 2018

Raising the Nooros field's efficiency to ~1.1 billion cubic feet of gas/day plus 8,600 barrels/day by drilling 15 wells.

USD 290M

Building West Maghagha substation in Minya

يوليو 2018

Built over 50,000 m² in El-Edwa district, north of Minya.

EUR 28.7M + USD 0.16M + EGP 95.15M

Building the Gabal El-Zeit wind power plant

يوليو 2018

Total capacity 580 MW across three phases of 240, 220 and 120 MW.

580 MW

Building Benban 1 solar substation in Aswan

يوليو 2018

Building the largest solar power plant on Benban village land in Aswan — the world's largest — generating ~90% of the High Dam's output.

USD 2B

Upgrading the Shabab gas power plant in Ismailia

يوليو 2018

Raising capacity using the latest clean-energy technology and adding 500 MW.

EGP 1.158B + USD 327M

Building Wadi El-Natrun substation in Beheira

يوليو 2018

Building transformers with 1,500 MW capacity.

EGP 69.34M + USD 0.168M + EUR 51.19M

Building Burullus combined-cycle power plant, north Kafr El-Sheikh

يوليو 2018

Building a power plant that is one of the world's largest combined-cycle plants.

EUR 2B + EGP 2.078B

Building Badr City substation, northeast Cairo

يوليو 2018

Total station capacity at 22/220/500 kV.

EGP 53M + USD 25.8M + EUR 68.98M

Building Beni Suef combined-cycle power plant

يوليو 2018

Building the East Ghayada power plant in Beni Suef, combined-cycle technology, 4,800 MW capacity.

EUR 2.05B + EGP 43M

Building the investment-clusters substation in 10th of Ramadan

يوليو 2018

An 11/66 kV substation, 2×40 MVA.

EGP 44M

Building Gohaina substation in Sohag

يوليو 2018

Built at 66 kV with expansions to absorb added generation capacity and reduce grid losses, reinforcing Upper Egypt.

EGP 37M

North Abu Qir 3 platform in the Mediterranean

يوليو 2018

Building a platform for new gas production of ~135 million cubic feet/day plus 3,300 barrels of oil and condensate/day by drilling 6 wells.

USD 220M

Upgrading the Gamil – Damietta gas line

مايو 2018

Upgrading the line at 42 inches and 50 km, serving Damietta and Port Said.

EGP 1.089B

Building Assiut East-Nile substation

أبريل 2018

Building the new Assiut East-Nile substation at 500/220/22 kV beside the industrial city to end power outages.

EGP 104M + USD 0.19M + EUR 31M

Building an organic-fertilizer factory at Mohamed Naguib Military Base in Matrouh

فبراير 2018

Building a factory over 20,000 m² to produce 10,000 m³ of plant compost per cycle.

2017 1 projects

Building the grain store in Qasr El-Basil, Fayoum governorate

مايو 2017

Building the grain store in Qasr El-Basil, Fayoum, with 50,000-ton storage capacity to preserve wheat.

50,000 tons
2015 1 projects

Building phases one and two of the Nubaria – Mit Nama gas line

نوفمبر 2015

Extending the gas line to feed North Giza power plant, in two phases: phase one 42-inch/34 km, phase two 32-inch/38 km.

EGP 1.197B